Kambo's - Perth, Western Australia

All Installed Split Systems*

All Installed Split Systems*

*Standard Installation includes:
2 meters of pipework and 15 meters of electrical cable.
Based on single storey home with easy access, back to back with the outdoor unit sitting on solid, stable ground.
Site must be structurally and electrically sound, free of asbestos and hazardous material. Jobsite unseen by Kambos.
Unit has been sized by the customer, onus is on customer for selecting the correct size.
Onus is on licenced installer regarding suitability of that air conditioner. Installation is at the discretion of the installer as well as any additional costs outside of what is included in a standard installation.

Onus is on customer to follow through with any promotions, redemptions, gifts or cashbacks offered by the manufacturer, through the manufacturer as per the terms and conditions laid out by the manufacturer

Please note during peak periods installation bookings may take 2 to 3 weeks.

Set Descending Direction

19 Item(s)

per page

Set Descending Direction

19 Item(s)

per page